Project Description

The construction of the Middleton-Cross Plains School District’s new elementary school was a portion of the $138.9 million referendum that was passed in 2018. This was the largest referendum in the state to be passed at the time. Electric Construction was contracted to install the lighting, power, and low voltage throughout the school.

Project Details